Monday, August 11, 2014

Hitachi Zaxis 470 LC Digs Deep and Fast on Knox Road Sewage Pipeline to Stayner.

More horsepower, more productivity
The ZX470LC-5’s greater horsepower, combined with optimized hydraulics for bigger arm- and bucket-digging forces, gets more work done in a day. Loaded with numerous new features, the ZX470LC delivers superior productivity and durability, while keeping operating costs low.

A lot of Rumble and Shaking going on during the Pipeline Construction on Knox Road. The pipeline is connecting
Clearview Sewage to Wasaga Beach's Sewage Treatment Plant for processing. Here are some shots taken near Knox and 41st.





No comments:

Post a Comment